Army Corps analysis finds Great Lakes pipeline tunnel would have sweeping environmental impacts

FILE - In this photo shot from a television screen provided by the Michigan Department of Environment, Great Lakes, and Energy in June 2020, shows damage to anchor support EP-17-1 on the east leg of the Enbridge Line 5 pipeline within the Straits of Mackinac in Mich. (Michigan Department of Environment, Great Lakes, and Energy via AP, File)

Building an underground tunnel for an aging Enbridge oil pipeline that stretches across a Great Lakes channel could destroy wetlands and harm bat habitats but would eliminate the chances of a boat anchor rupturing the line and causing a catastrophic spill, the U.S. Army Corps of Engineers said Friday in a long-awaited draft analysis of the proposed project's environmental impacts.

The analysis moves the corps a step closer to approving the tunnel for Line 5 in the Straits of Mackinac. The tunnel was proposed in 2018 at a cost of $500 million but has been bogged down by legal challenges. The corps in April after President Donald Trump ordered federal agencies in January to identify energy projects for expedited emergency permitting.

The ɫtv Press. All rights reserved.

More Environment Stories

Sign Up to Newsletters

Get the latest from ɫtvNews in your inbox. Select the emails you're interested in below.